Chestnut done

ppride

Canoe Builder
The 1970 Chestnut Guide is done and delivered to the owner. The 1914 OT IF is filled and drying. Pete
 

Attachments

  • IMG_8726.JPG
    IMG_8726.JPG
    123.6 KB · Views: 231
  • IMG_8724.JPG
    IMG_8724.JPG
    187.4 KB · Views: 266
  • IMG_8725.JPG
    IMG_8725.JPG
    197 KB · Views: 237
Thanks Kathryn, The lakes are still frozen. The ice should go out in the next 3 or 4 weeks. Pete
 
Back
Top