ppride Canoe Builder Apr 14, 2011 #1 The 1970 Chestnut Guide is done and delivered to the owner. The 1914 OT IF is filled and drying. Pete Attachments IMG_8726.JPG 123.6 KB · Views: 256 IMG_8724.JPG 187.4 KB · Views: 286 IMG_8725.JPG 197 KB · Views: 258
The 1970 Chestnut Guide is done and delivered to the owner. The 1914 OT IF is filled and drying. Pete
Kathryn Klos squirrel whisperer Apr 14, 2011 #2 Looks great, Pete-- is that snow out of the way so she can get into the water?
OP OP ppride Canoe Builder Apr 15, 2011 #3 Thanks Kathryn, The lakes are still frozen. The ice should go out in the next 3 or 4 weeks. Pete