I have just finished painting my Old Town wood and canvas guide model.
I removed the rub rails before painting.
How long should I wait( in temperatures of 75 in the day and 50-60 at night with 50-75 % humidity more or less) before I install the rub rails and new Old Town decals.
I assume at least a week?
I removed the rub rails before painting.
How long should I wait( in temperatures of 75 in the day and 50-60 at night with 50-75 % humidity more or less) before I install the rub rails and new Old Town decals.
I assume at least a week?